Project intake: load, route, duty and service evidenceRequest the correct regional contact
Project routing

Contact Baoli

Use the application form to reach the appropriate commercial or technical route. Begin with the facility country, load, aisle, lift height, duty cycle and project stage. Responsible entity, direct contact details and any contractual address are confirmed in issued correspondence rather than assumed from an unverified public listing.

01

Project location

State the receiving facility, market and delivery constraints. Local product availability, workplace requirements, energy options and service coverage can change the shortlist.

02

Phone + email routing

Submit the secure form to request the appropriate channel. Direct telephone and email details are returned after the region and request type are identified.

03

Working window

Include time zone, shift pattern, preferred contact window and any shutdown, survey or commissioning period. Response commitments depend on the confirmed scope.

Application map

Mark the route before describing the truck

A useful sketch shows pickup and drop positions, clear aisle, turning points, overhead obstructions, doors, slopes, dock plates, pedestrian crossings, charging or fuel access and the area available for service. Add the highest lift point and any attachment envelope.

Describe the representative load in kilograms and millimeters, including the center of gravity, pallet condition and overhang. If loads differ by shift or supplier, show the range rather than a convenient average. Note the normal and peak movement frequency and how long the peak window lasts.

For an existing fleet question, include equipment identity, observed condition, active warnings and whether the asset has been safely isolated. Do not send passwords, export-controlled drawings or other highly sensitive information through the public form; request an approved secure transfer route instead.

Warehouse forklift route map with pickup, drop and traffic constraints
Two-column application form

Send the minimum decision set

Explain the task that governs selection, not every warehouse process. The first review is clearer when it includes:

  • load mass, dimensions, center and pallet condition;
  • lift height, aisle width, turning and floor constraints;
  • travel and lift cycles by normal and peak shift;
  • operator, pedestrian and manual-equipment interactions;
  • attachment, emissions, battery, charging or fuel requirements;
  • required decision, region and target operating date.

Submitted figures are project inputs until checked against the selected product configuration, site survey and applicable local requirements. A form submission is an inquiry, not an order, quotation, capacity statement or performance guarantee.

Application context

Information is handled according to our Privacy Policy.